Creation of cable system complex, designed to organize wireless connection on the “Cherkizovo” robotic factory
The works were conducted within the limits of the renovation of the factory, manufacturing meat and sausage products. The territory of the new factory is more than 95 000 m2: 3 buildings with a total area of 35 000 m2 are situared in Topkanovo, urban district of Kashira. The realization was conducted in several stages. The first stage was based on the usage of Cisco Systems' new high-capacity hardware equipment. The next stage of the SCS realization was made on the basis of Telegärtner Karl Gärtner GmbН equipment. The whole range of the components for grids creation on copper and optical cables was included in the list of embedded solutions. Specially designed shelves, based on APC and Rittal equipment, became the ideal engineering solution for the arrangement of passive and active equipment. Cable passages are built on DKC equipment. This project stimulated the customer to take a quantum leap: the usage of robots and manufaturing process ACS in line production allows to exclude human factor in manufacturing procedure and increase biosafety level.
Provision of security of Crocus Expo International Broadcast Center during FIFA-2018
Implementation of hyperconverged platform In Otkritie bank